How to assign a cost center to equipment or property

Last updated: 2025-08-12

How do you assign a cost center?

  1. Open the organizer where you manage your assets.
  2. Open the details page of the asset you want to link to a cost center.
  3. Choose the appropriate cost center from the list and assign it to the asset.
  4. Save your changes.